To control and utilize water and solid waste, a Sewage Treatment Plant of 5,50,000 KLD capacity has been installed in the complex of residential school ‘Vidyagram’ in Bahal. About 6-10 lac gallon of water treated per day is utilized by the horticulture unit and also for watering various lawns and playfield in BRCM Education Campus. Extensive measures are taken to harvest and recycle rain water by establishing rain water harvesting pits in the BRCM campus.